News - Non-appellable building permit

Concrete-steel covering

 

We finished the basic concrete-steel layer.

F inally, we can work on construcion works with 100% performance, after a lot of necessary paper works. The strip foundation made first part of August. We made the necessary pipeline works which go under the building, and after we have made the covering concrete-steel layer.

It has to become solid before the constuction of load bearing walls

Comments are closed.

Buy now