News - Non-appellable building permit

2nd floor load bearing walls

 

The first walls have been risen!

A fter the necessary soliding process, we made the load bearing walls belong to the ground floor.

Workers have been started to make the frameworks of the slab between the gound and 2nd floor. They are installing the steel reinforcement also. As soon as it is ready, the conrete filling can come.

Comments are closed.

Buy now